Design, landlord approval and the city permit

Know the steps before you promise an opening date.

Start with the address

The address tells us which city reviews the sign. The property’s sign rules, what your landlord asks for, the building and the sign you want all shape the next steps.

Two approvals, two different things

Landlord approval and the city permit are two different things. Some jobs also need structural or electrical drawings. An old sign in the same spot does not mean the new one is approved.

What the City of San Diego says

The City of San Diego publishes which signs need a permit, which do not, and which need an extra review. Check the current city page for your kind of sign, or ask us. Other cities have their own rules.

Set the dates once the scope is clear

Design changes, decisions from you or your landlord, comments from the city, materials and access for the install can all move the dates. Build time in the shop is only one part of the job.

Source: City of San Diego. Reviewed September 16, 2026. Official sign permit guidance

All planning guides

Free quote

Tell us what you have in mind.

Send the basics. We get back to you within 24 hours, and the quote is free. If we need a photo or a measurement first, we will ask.

Not sure which sign you need? That is a good place to start.

Map of the National City shop122 Civic Center Dr.
National City, CA 91950
Map data © Google

Have photos or a logo? Send them by email or WhatsApp. Use the same name as your request.

* Required. We only use your details to answer your request. Privacy

CallWhatsAppGet a quote